Due to nationwide supply chain issues, the requirement of Customer Installation Standards manual, section 9.1.2.1, line 14: “All Underground Connected meter sockets and power panels shall be side-wired” will be relaxed for projects with a lead time less than 15 weeks or in the event of emergency replacement until December 31,2025. UL-rated meter bases that are designated by the manufacturer as designed for OH AND UG will temporarily be allowed for UG service. All other requirements of section 9.1.2.1 will be required. This temporary change will expire on December 31, 2025. The availability of side-wired meter bases will be reviewed again in December.
Builder services and standards
Builders can use the form below to have electric service turned on for new residential construction:
Standards information:
To register to receive email notifications of future changes to this standard, click here.
- Power quality standards for electric service (2024)
- Power quality standards for electric service (2008)
Customer installation standards drawings
OVERHEAD
- Overhead temporary
- Typical permanent overhead (under roof line)
- Typical permanent overhead (above roof line)
- Overhead central service pole
UNDERGROUND
Elevating a building or home
Service to permanent pole location (serves mobile homes and some buildings)
Meters
Residential/small non-residential
- 120 volt (two wire)
- Overhead self contained
- Underground self contained
- 277/480 volt service on pole (overhead)
- 277/480 volt service (from underground source)
Commercial multiple meters (shopping centers, apartments, etc.)
Large industrial current instrument transformer rated meters
Miscellaneous
Questions or concerns? Call 1-800-ENTERGY.