Commercial and Industrial Prescriptive Program
Cash incentives to help you save money on your energy bills and increase
the comfort of your facilities.
Entergy Arkansas, Incs Commercial and Industrial Prescriptive Program can
Provide the Support and Incentives You Need to Solve These Problems:
High energy bills.
Inefficient or poor interior / exterior lighting quality.
Lack of lighting control.
Inefficient or poor HVAC / chiller performance.
What are the Benefits?
Achieve significant, long-term electricity savings.
Earn incentives for completing qualifying energy efficiency projects.
A local network of participating contractors click here.
Who is Eligible?
Commercial and Industrial facilities that are current Entergy Arkansas, Inc.
customers..
Eligible Measures:
Improved building design (new construction only).
Interior / exterior lighting retrofits.
Interior / exterior lighting controls.
HVAC / chiller replacement.
Commercial refrigeration.
Commercial kitchen and plumbing upgrades.
See typical savings and incentives here.
Ready to Get Started?
Contact the Energy Efficiency Solutions Center at
(877) 212-2420 or Email Us.
LargeCommercialEAI@clearesult.com
Interested in becoming a Trade Ally?
Email us or call 501-265-0249 for more
details.
Typical Industrial
Facility Project
|
| This example illustrates a
possible scenario that might exist at a reasonably large industrial
facility. Simulated existing conditions and sample proposed retrofits
are listed with example calculations of energy savings, incentives, and
simple payback. The data given below is not necessarily indicative of
what you may see at your site, but can be reviewed to understand how the
program will operate and the potential value of a "Custom" project at
your facility. |
|
Existing Conditions |
Proposed Retrofits |
Annual Energy Savings
(kWh) |
Assumed Blended
Electrical Rate ($/kWh) |
Annual Energy Savings ($) |
Entergy Base Incentive
Rate |
Entergy Bonus Incentive
Rate |
Total Incentive Amount
($) |
Est. Project Cost ($) |
Est. Simple Payback (Yrs) |
|
(3) 200 HP air compressors with inefficient throttling control, minimal
air storage, and independent staging controls for each compressor based
on system pressure |
Replace the oldest compressor with a new 250 HP variable speed air
compressor, add system air storage, and provide a system controller to
stage/trim the air compressors based on system pressure |
345,781 |
$0.065 |
$22,476 |
$0.15 |
$0.04 |
$65,698 |
$90,838 |
1.1 |
|
(3) 50 HP constant speed motors with on/off control that could be
controlled at variable speed while maintaining process integrity |
Provide (3) variable speed controllers for the motors and verify
induction duty capability or place low-speed limitations according to
motor manufacturer's specifications |
112,500 |
$0.065 |
$7,313 |
$0.15 |
$0.04 |
$21,375 |
$30,780 |
1.3 |
|
(300) 400 watt metal halide fixtures |
Replace metal halides with (300) 4-lamp T5HO fixtures and add occupancy
controls in appropriate areas |
278,154 |
$0.065 |
$18,080 |
$0.07 |
$0.04 |
$30,597 |
$69,525 |
2.2 |
|
(75) 2'x4', 4 lamp T8 with electronic ballasts with no occupancy
controls |
(75) 2'x4', 2 lamp T8 fixtures with premium efficiency ballasts and add
occupancy controls in some areas |
19,278 |
$0.065 |
$1,253 |
$0.07 |
$0.04 |
$2,121 |
$5,794 |
2.9 |
| |
TOTALS |
755,713 |
|
$49,121 |
|
|
$119,791 |
$196,936 |
1.57 |
| The total annual savings would
be approximately 773,713 kWh, resulting in an estimated $49,121 in
annual utility savings. The estimated cost of this project (using the
above simulation) is $196,936, with an estimated incentive of $119,791.
If the facility was to make these upgrades, the net project cost to the
customer (after incentive) would be $77,145, yielding an approximate 1.6
year payback. |